s/v MIGRATION
2013-15 Refit Task List
Phuket, Thailand
Area | Item |
Anchoring | Create new system for securing bow anchor |
Anchoring | Galvanize anchor |
Anchoring | Aft Locker – Penetrating epoxy inside of forward bulkhead |
Anchoring | Service and Paint Windlass Motor |
Carpentry | Raise base on aft cowl vents |
Carpentry | Change settee seat and make floorboard cutout for fuel tank |
Carpentry | Outside Shower Mounting Plate |
Carpentry | Port Mizzen Sheet Winch Pad |
Carpentry | Reinforce Shelf in Port Ama |
Carpentry | Drawer & Strorage Box for flatware in galley |
Dinghy | Fix covers |
Dinghy | Fix seats (new plastic pieces from Portabote) |
Electrical | Change Main Saloon Alpenglows to Red LEDS |
Electrical | Fix alternator |
Electrical | Install Blue Sky meter |
Electrical | Install Starting battery voltmeter |
Electrical | Install Stern Light in new pulpit |
Electrical | Interior indirect LED Lighting w/sconces |
Electrical | New light above fridge |
Electrical | Pilorhouaw Solar Panels - Lengthen cable and run through roof |
Electrical | Run DC wiring to Pilothouse and add light |
Electrical | “Pump running” light for FW pressure pump |
Electrical | Running Lights Bow – new wiring |
Electrical | Stbd Ama cway light – fix |
Electrical | Stbd Ama light Switch – fix |
Electrical | V-berth light switch – fix |
Electrical | Add DC plug in aft cabin on stbd side |
Electrical | Add DC Plug to v-berth |
Electrical | Find problem with dc plug in aft cabin |
Electrical | Power to Aft SW washdown |
Electronics | Wifi NMEA iMUX |
Electronics | Install KISS antenna |
Electronics | New wind instrument |
Engine | Strut Vibration – check drive train, remount/realign strut |
Engine | Clean Shaftseal |
Engine | Maintenance |
Engine | Modify Exhaust Fitting |
Engine | New switch boots on engine panel |
Engine | Racor Vacuum Gauge - Fix |
Engine | Remove/Refurbish/Reinstall Max Prop |
Engine | Replace intake thruhull 1 ½” with Marelon |
Engine | Extend 2nd Engine Oil gauge to panel |
Engine Room | Soundproof paint |
Exterior | Polish Stainless |
Exterior | Paint BBQ & Fish Lockers, Lip of Engine Room |
Exterior | Check fiberglass all over deck |
Exterior | Fix low spots in Stbd Cockpit seat |
Exterior | Fix low spots around mainmast step |
Exterior | Fix low spots in Stbd Cockpit Floor |
Exterior | Port Cockpit crack in floor – fix |
Exterior | Reglass/Repair PH roof handles |
Exterior | Replace Fish locker lid |
Exterior | New Line Box in starboard cockpit |
Exterior | Strengthen/Recover Samson posts |
Exterior | Varnish Pilot House Wood |
Exterior | New floor in Trunk |
Exterior | Fix Trunk Hinges |
Exterior | Install forward ama rub strakes |
Exterior | Install New Trampolines |
Exterior | Propane Box - Fix. and Gelcoat lid |
Exterior | Put name on after painting |
Exterior | Remove and rebed all deck hardware, ports, hatches, etc. |
Exterior | Replace Missing Cowl |
Galley | Clean, refurbish fridge and add better insulation around copper tube |
Galley | New Galley exhaust fan |
Haulout | Strip old bottom paint, barrier coat, new Bottom Paint |
Interior | Paint Port Ama Cway |
Interior | Refinish Shower |
Interior | Find and fix all delaminated veneer |
Interior | Fix ceiling in main head |
Interior | New floorboards in amas where needed (including center grates) |
Interior | Paint inside of amas where needed including bilges and storage areas |
Interior | Refinish Table and raise 9 cm |
Interior | Varnish all wood |
Interior | Varnish Ama Steps |
Interior | Add extra fan to main saloon |
Interior | Add extra holder on soundproofing on aft cabin floorboard |
Interior | Add Hella fan to main head |
Interior | Add vent in pantry |
Interior | Install wall battens in stbd ama around port and portlight (repair hull and penetrate everything) |
Interior | Pantry Door holder open |
Interior | Remove headliner and check deck |
Interior | Repair Hella fans |
Interior | Fix Bunk Bug Screen |
Mast | Deck Lights – fix |
Mast | Fill dents in midway of main mast |
Mast | New Steaming Light |
Mast | New Strong Track on Mizzen |
Mast | New Wind Instrument |
Metalwork | True Shaft |
Metalwork | Make main gooseneck stronger and stop rattle |
Metalwork | Rub strake on ama bows |
Metalwork | Stop maststep vang fitting from rattling |
Metalwork | Stern Pulpit – New |
Pilothouse | Locking mechanism for seat support |
Pilothouse | Install New Engine hatches w/gas struts |
Plumbing | Webasto – Touch Up Paint |
Plumbing | Aft Trunk Bilge Pump |
Plumbing | Clean watermaker flow meter |
Plumbing | Add flappers to main and engine room bilge pump thruhulls |
Plumbing | Lavac Toilet base (main head) |
Plumbing | Lavac Toilet bowl (stbd head) - replace |
Plumbing | New outside shower fitting |
Plumbing | Plumbing: Watertank vents – fix watermaker overfill problem |
Plumbing | Rebuild head pumps and Y valves |
Plumbing | Replace stbd head seacock with Marelon |
Plumbing | Replace Stbd head toilet hoses |
Plumbing | Watermaker: Rebuild Clark, move pump, new wire, move filters |
Plumbing | Webasto replace fuel nozzle |
Plumbing | Rebuild Galley footpumps |
Plumbing | Plumbing: FW System Accumulator |
Ports/Hatches | Rebed/Replace all fixed port plexiglass |
Ports/Hatches | Rebed/Replace all opening port plexiglass |
Ports/Hatches | Replace PH aft windows with sliding windows |
Ports/Hatches | Replace PH front windows |
Ports/Hatches | Replace Port & Stbd Fwd Ama hatches |
Rigging | New Jib Sheets |
Rigging | Preventer/Vang bail (soft?) |
Rigging | Replace Jacklines and add jackline to aft deck 76’ |
Rigging | Mainsheet connection to boom – make it soft |
Rigging | Fix cracks at bottom of Mizzen mast |
Rigging | Bigger primary winches |
Rigging | Boom Vang – fix blocks |
Rigging | Chainplates – move outboard both main shrouds |
Rigging | Chainplates – move outboard stbd mizzen upper |
Rigging | Chainplates – replace 4 main lowers |
Rigging | Change jib control cars blocks to allow car to move further forward |
Rigging | Double end mainsheet |
Rigging | Double end mizzensheet |
Rigging | Mainsheet Blocks |
Rigging | New Lower Shroud Chainplate Covers with threaded inserts |
Rigging | Replace clams for jib lead control lines |
Rigging | Replace Main and Mizzen Topping Lift |
Rigging | Replace Mainsheet |
Rigging | Replace Mizzen Halyards |
Rigging | Replace Mizzensheet & Deck Block |
Rigging | Replace Spinnaker Halyards |
Safety | Fire Extinguishers – service |
Safety | MOB Gear storage under ama |
Sails | Repair spinnaker |
Sails | Check over mizzen and add leather to batten pockets |
Sails | Add Strong Track hardware to mizzen |
Sails | New Mainsail |
Sails | Repair Jib Stitching |
Sewing | Various Strops |
Sewing | Cockpit cushions – new |
Sewing | Jerry Can Covers |
Sewing | Replace Velcro on curtains where needed. |
Sewing | Mosquito screens |
Sewing | Fix Awnings |
Sewing | Fix Sail Covers |
Sewing | Fix/redesign line bags |
Sewing | Reupholster Helm Chair |
Sewing | Replace Snarp Windows |
Steering | Monitor – new control blocks in Pilothouse |
Steering | Monitor – new lines |
Structural | Replace Glass outer ama topsides |
Structural | Fix Bulkhead Between Batteries and Aft Watertank |
Structural | Fix Cracks in frame in stbd ama |
Structural | Fix Shower Frame Crack |
Structural | Fwd Port Ama – Finish storage shelf repair. |
Structural | Remove battery boxes, check hull, paint bilge |
Structural | Paint Deck |
Structural | Paint Topsides |
Structural | Install spinnaker tracks |
|
|
| ADDED DURING REFIT |
Anchoring | Make newWindlass/Bow Roller Pad |
Carpentry | Route under Fwd Port Ama Hatch Frame |
Carpentry | Sampson Post Teak Caps |
Carpentry | Trim Floorboard over battery box to make lighter |
Carpentry | PH Seat Support Grate Adjustment |
Carpentry | Block for PH Light |
Electrical | Reinstall Secondary Electrical |
Electrical | Clean Caframo Fans |
Electrical | Polish Tricolor Plastic |
Electrical | Fix Hella fan broken bare wire with drop of silicone sealant |
Electrical | Improve and rerun wiring in starboard ama, head, and bunk |
Electrical | Reinstall Engine Room Electrical |
Electrical | Reinstall Primary Electrical |
Electrical | Send Blue Sky Charge Controller to factory for calibration |
Electrical | Replace failed Balmar Regulator |
Electronics | Reinstall HAM/TUNER/PACTOR |
Engine | New mounts & shims (except we ended up going back to the old mounts) |
Engine | Recalibrate fuel gauge |
Engine | Replace fuel tank. |
Engine Room | New soundproofing material on hatches |
Engine Room | Paint Shaft Coupling & Engine Mounts |
Engine Room | Paint |
Engine Room | Fix Gas Strut connections on hatches |
Engine Room | Reinstall all parts from Engine Room |
Exterior | Bow Repair under bow roller |
Exterior | Running Lights Bow – New Base blocks |
Exterior | Replace board for Edson emergency pump |
Exterior | Epoxy / Clear Coat Sampson Posts |
Exterior | Install transducer with new fairing blocks |
Exterior | Move Sink Drain Thruhull higher |
Exterior | Step in Forward Port Ama storage area |
Exterior | Step in trunk |
Galley | Fix Stove grates |
Galley | Replace failed fan on Tropikool unit |
Int/Ext | Hang doors (5) |
Interior | New acrylic for Nav station chart table |
Interior | Nonskid on Steps |
Interior | Repair gap left by Nhoon in Ama Cway |
Interior | Repair gap Nhoon left in port ama cway |
Interior | Binocs Holder in nav station |
Interior | Epoxy bottom of floorboard above shaftseal |
Interior | Wood covers for cable runs by nav station |
Interior | Laundry cubby in v-berth |
Interior | Replace missing ama companionway ladder bracket |
Interior | Paint edges around ports |
Interior | Sealant/Epoxy on holes for Ama Cway steps |
Interior | Varnishing Touchups – settee corner and helm board handle |
Interior | Reinstall Bug Screen - main companionway |
Mast | Chafe Guard at top of Main Mast |
Mast | Fix non-turning sheaves on Main |
Mast | Fix wires at midway on main mast using waterproof junction box |
Mast | New Halyard Chafe Guard on Mizzen |
Mast | New Mizzen Halyard self-tailing winch |
Mast | Remove paint from mizzen gooseneck, fix up |
Mast | Repaint Mizzen base and touch up other areas |
Mast | Repair top of mizzen |
Mast | Touch up paint on main mast |
Metalwork | Incorporate line chocks in & new welds on bottoms to fill in gaps |
Metalwork | Redrill Winch Pads |
Metalwork | New BBQ Heat dispersal Plate |
Metalwork | Modify Mizzen Gooseneck Track |
Metalwork | Repair opening ports & Fill screw holes |
Metalwork | Shorten Gas Struts for Ama companionways |
Metalwork | Fill holes in main mast step |
Metalwork | Fill holes in mizzen mast step |
Metalwork | New portlights on sides of amas |
Metalwork | Redesign fwd stbd leg of bow pulpit so no interference with bow roller |
Metalwork | Replace portlight in main saloon |
Metalwork | Rods for Samson posts |
Metalwork | Swan neck for Pilothouse wires |
Metalwork | Bow protector plate (below anchor roller) |
Metalwork | Bracket for sconce lighting |
Metalwork | New Rudder Bearing and mount |
Pilothouse | Attach small seat support grate to wall |
Pilothouse | Beef up storm boards where cracked & Refinish |
Plumbing | New Connections on Dinghy Bilge Pump |
Plumbing | Connect Propane |
Plumbing | Fix/replace Hot Water Recirc Pump |
Plumbing | Fix main saloon bilge pump switch problem - Replace Switch |
Plumbing | Fix shower sump |
Plumbing | Install Main Head |
Plumbing | Install Stbd Head & Pump |
Plumbing | Install Stbd Head Sink, Drain, and plumbing |
Plumbing | Move Main head SW intake to under toilet |
Plumbing | Reinstall Plumbing – Fresh Water |
Plumbing | Reinstall Plumbing – Fresh Water, non-pressurized |
Plumbing | Reinstall Plumbing – Salt Water |
Plumbing | Webasto Exhaust - Replace |
Ports/Hatches | Bumpers/Holder openers for Ama Companionway Doors |
Ports/Hatches | Fix port Bomar hatch pin and replace both Bomar hatch dog seals |
Ports/Hatches | Fit New doors and hatches for ama companionways (watertight) |
Ports/Hatches | Add struts to new forward ama hatches |
Ports/Hatches | Install new ama companionways |
Ports/Hatches | New main saloon hatches |
Rigging | Garhauer Broken springs in vang and adjust length |
Rigging | Clean and lube winches |
Rigging | Modify Boom for mainsheet block |
Sails | Add green foam tape to mizzen batten pockets |
Sewing | Cloth fender covers for Plover fenders |
Sewing | Winch covers |
Steering | Paint Emergency Tiller |
Steering | Replace backing block under rudder log |
Steering | Install monitor control lines through stern with cowl |
Steering | Install monitor turning blocks through stern |
Steering | Install rudder and steering system (quadrant, cables, wheel, etc.) |
Steering | New Rudder |
Steering | Realign blocks and make bulkhead holes larger and protected |
Steering | Reinstall rudder log |
Steering | Remount Monitor |
Structural | Make fwd PH windows fit |
Structural | Fix Nhoon screw up on port spinny track backing blocs |
Structural | Fix port companionway so new door fits |
Structural | Rebuildy main hull and fiberglass |